Discover#RailnatterHow not to do feasibility studies | #Railnatter 261
How not to do feasibility studies | #Railnatter 261

How not to do feasibility studies | #Railnatter 261

Update: 2025-05-14
Share

Description

We're looking at the proposals for a new line connecting the North Wales Main Line and the Cambrian Coast Line between Bangor and Afon Wen... Are the plans any good? Should they go ahead even if the correct route for a north-south Welsh mainline is at the other side of the country?


Way back in Episode 57 we analysed where any future north-south Welsh railway needed to be, and we fleshed those plans out into the Dragon Line/Llinell Y Ddraig in Episode 116. Let's see how this report aligns with that - or doesn't.


Download the report here: https://www.gov.wales/sites/default/files/publications/2025-02/re-opening-the-bangor-to-afon-wen-rail-line-feasibility-study.pdf


Enjoyed this? Please do consider supporting #Railnatter at https://patreon.com/garethdennis or throw loose change at me via https://paypal.me/garethdennis. Merch at https://garethdennis.co.uk/merch. Join in the discussion at https://garethdennis.co.uk/discord.


You can also buy my book #HowTheRailwaysWillFixTheFuture: https://bit.ly/HowTheRailways

Comments 
In Channel
loading
00:00
00:00
x

0.5x

0.8x

1.0x

1.25x

1.5x

2.0x

3.0x

Sleep Timer

Off

End of Episode

5 Minutes

10 Minutes

15 Minutes

30 Minutes

45 Minutes

60 Minutes

120 Minutes

How not to do feasibility studies | #Railnatter 261

How not to do feasibility studies | #Railnatter 261

Gareth Dennis